Quikrete comparison
Quikrete’s current Setting Posts in Concrete guide states dig one-third to one-half of the post’s above-ground length, plus about six inches for gravel. This calculator shows both endpoints of that range so the band is visible. An older Quikrete project sheet used different wording (one-third of overall post length) — cited in Sources; we do not silently mix the two equations. The planning max still prefers the deeper (½) above-ground endpoint unless local or CLFMI figures are greater.
Chain-link comparison
In chain-link mode the tool also evaluates CLFMI’s commercial footing baseline: 24 inches minimum through 4 ft fence height, plus 3 inches per foot of height above 4 ft, with hole diameter about four times post outside diameter. CLFMI still warns that frost, soil, height, and wind can require more — enter those as local depth when you have them.
Frost, soil, wind, and gates
This site does not ship a national frost-depth database. Weak soil, privacy slats, high wind, corners, and gate posts often need deeper or larger footings than a line-post planning baseline. Toggle the privacy/high-wind warning when it applies, and treat gate and corner details separately. Full-run post counts and bags for an entire fence still live on the fence materials calculator; annular bag math walkthrough: concrete bags per fence post.